These Projects are part of Capital Improvement Projects being developed on behalf of the City of Chicago’s Department of Transportation (CDOT)
News and Updates
Project, located at West Fillmore Street from South Campbell Avenue to Dead End West, being developed on behalf of City of Chicago’s Department of Transportation (CDOT).
Procurement Details
View the Construction Contract procurement details here:
Contract Information
Engineer of Record: Civiltech Engineering (by CDOT)
General Contractor (GC): MQ Sewer & Water Contractors, Inc. DBA MQ Construction Company
GC Contract: C1605
Pay Applications
Press Releases

Project being developed on behalf of City of Chicago’s Department of Transportation (CDOT), located in Wards 40 and 47 within the various intersections as follows:
- W. Leland Avenue, N. Western Avenue to N. Lincoln Avenue
- N. Lincoln Avenue, W. Leland Avenue to Brown Line ‘L’ Tracks
- N. Western Avenue, W. Eastwood Avenue to W. Leland Avenue
The project consists of Streetscape improvements on W. Leland Avenue from N. Western Avenue to N. Lincoln Avenue, N. Lincoln Avenue between W. Leland Avenue and the CTA elevated tracks to the south, and N. Western Avenue from W. Eastwood Avenue to W. Leland Avenue. The project also includes the full reconstruction of the plaza located at the SE corner of N. Western Avenue and W. Leland Avenue, reconstruction of the existing public parking lot at the SW corner of W. Leland Avenue and N. Lincoln Avenue, and renovations to the area under the CTA elevated tracks between N. Western and N. Lincoln Avenues, adjacent to the CTA Western Brown Line Station.
The improvements include geometric changes to the W. Leland Avenue roadway, new traffic signal at N. Western and W. Leland Avenues, new protected bike lane, new lighting, resurfacing and pavement markings, curb and gutter replacement, landscaping improvements, drainage work, new site furniture, and community identifier.
Procurement Details
View the Construction Contract procurement details here.
Contract Information
Engineer of Record: TYLin (by CDOT)
General Contractor (GC): F.H. Paschen, S.N. Nielsen & Associates LLC
GC Contract: C1612
Pay Applications
Press Releases

Projects being developed on behalf of City of Chicago’s Department of Transportation (CDOT) at the following locations:
- East 109th Street from South Avenue O to South Burley Avenue, Chicago, IL
- South Hoyne Avenue from West 52nd Place to Dead End, Chicago, IL
- South Harding Avenue from West 24th Street to Dead End, Chicago, IL
- East 102nd Street from Dead End to South Commercial Avenue, Chicago,L
The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the (4) locations indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main and drainage structures, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, roadway lighting, thermoplastic pavement marking, signs, topsoil, sodding, and tree planting and removal.
Procurement Details
View the Construction Contract procurement details here.
Contract Information
Engineer of Record: CDOT
General Contractor (GC): Sumit Construction Company, Inc.
GC Contract: C1616
Pay Applications
Press Releases

Projects being developed on behalf of City of Chicago’s Department of Transportation (CDOT) at the following locations:
- West 112th Street from South Fairfield Avenue to South Rockwell Street, Chicago, IL
- South Loomis Street from West 121st Street to West 120th Street, Chicago, IL
The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the two (2) locations indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, roadway lighting, thermoplastic pavement marking, signs, topsoil, sodding, and tree removal and planting
Procurement Details
View the Construction Contract procurement details here:
Contract Information
Engineer of Record: CDOT
General Contractor (GC): MQ Sewer & Water Contractors, Inc. DBA MQ Construction Company
GC Contract: C1617
Pay Applications
Press Releases

Projects being developed on behalf of City of Chicago’s Department of Transportation (CDOT) at the following locations:
- South Oakley Avenue from West Garfield Boulevard to West 57th Street, Chicago, IL
- East 94th Street from East End Avenue to South Cregier Avenue, Chicago, IL
- South Oakley Avenue from West 58th Street to West 59th Street, Chicago, IL
The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the (3) locations indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, and tree planting.
Procurement Details
View the Construction Contract procurement details here.
Contract Information
Engineer of Record: CDOT
General Contractor (GC): Sumit Construction Co., Inc.
GC Contract: C1618
Pay Applications
Press Releases

Project being developed on behalf of City of Chicago’s Department of Transportation (CDOT) at the following locations:
- West Barry Avenue from North Narragansett Avenue to North Melvina Avenue, Chicago, IL
The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the location indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting.
Procurement Details
View the Construction Contract procurement details here.
Contract Information
Engineer of Record: CDOT
General Contractor (GC): Benchmark Construction Co., Inc.
GC Contract: C1619