Advertisement for Bids: C1625 – Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St. and W. 114th St.)

PROJECT DESCRIPTION:
The Public Building Commission of Chicago (PBC) has invited all Contractors to bid on PBC Contract C1625, Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.).

The WPA Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) Project is located at:

  • W.  92nd St. – West 92nd  Street from South Leavitt Street to South Hamilton Avenue Chicago, Illinois
  • W. 106th St. – West 106th Street from South Christiana Avenue to South Kedzie Avenue  Chicago, IL
  • W. 107th St. – West 107th Street from South Spaulding Avenue to South Kedzie Avenue  Chicago, IL
  • W. 114th St. – West 114th Street from South Rockwell Street to South Western Avenue Chicago, IL

The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the four (4) locations indicated above. Work includes but is not limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, roadway lighting,  thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting.

Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed (‘NTP’) for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP.

DOCUMENT AVAILABILITY:

  • Book 1 Instructions to Bidders may be found here 
  • Master Bid Form may be found here 
  • Plans and specifications, including any Addenda issued for the above-referenced project may be found here: Cross Rhodes Planroom.
  • The list of Assist Agencies who will have access to complete sets of digital drawings and specifications can be found here.

PRE-BID ACTIVITIES:

On Friday, June 13, 2025, PBC will host a Non-Mandatory Virtual Pre-Bid Meeting at 11:00 a.m., and a Non-Mandatory Virtual Technical Review Meeting at 11:30 a.m. on ZOOM virtual meeting platform.  

To join click on the link or call the number below:

Subcontractors and suppliers are encouraged to attend.

Pre-Bid/Tech Review Materials:

  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) – Pre-Bid and Tech Review Presentation (will appear here once available)
  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) – Pre-Bid and Tech Review Attendance Sheet (will appear here once available)

To view related video(s), please click on respective link(s) below:

  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) – Pre-Bid and Tech Review Video (will appear here once available)

Addenda:

(To be uploaded once available)

BID OPENING:

Sealed bids shall be received electronically by Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org and pbc-procurement@cityofchicago.org, by 11 a.m. on Tuesday, July 1, 2025. A Public Bid Opening, streamed on the PBC YouTube channel, will immediately follow at 11:00 a.m.

Please refer to Book 1 Instructions to Bidders, Submission of Bids, for further instructions.

Bid Tabulation:

  • Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) – Bid Tabulation (will appear here once available)

To view related video(s), please click on respective link(s) below:

  • Works Progress Administration (“WPA”) Street Reconstruction (W. 92nd St., W. 106th St., W. 107th St., W. 114th St.) – Bid Opening Video (will appear here once available)

QUESTIONS:
All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org no later than June 24, 2025.

Public Building Commission of Chicago
Mayor Brandon Johnson, Chairman
Ray Giderof, Executive Director

Office of Inspector General Complaint Hotline
If you see corruption, fraud, waste, or dishonest practices of any kind please report it to the City of Chicago Office of Inspector General (OIG) – PBC’s oversight body. Concerned employees, contractors, consultants, and members of the public may contact OIG via its independent hotline and website.

Telephone Reporting: (866) IG-TIPLINE (866-448-4754).

Web Reporting:  http://ChicagoInspectorGeneral.org/Get-Involved