PROJECT DESCRIPTION:
PBC Contract C1629, Chicago Department of Transportation (“CDOT”) Capital Program – Alleys (Various Locations) – Package 7.
The Chicago Department of Transportation (“CDOT”) Capital Program – Alleys (Various Locations) – Package 7 projects are located at:
22931 W. Arthur Ave.: W. Arthur Avenue/ W. Devon Avenue/N. Claremont Avenue/ N. Oakley Avenue – Ward 50
22932 W. Lawrence Ave.: W. Lawrence Avenue/ W. Leland Avenue/N. Malden Street/ N. Magnolia Avenue – Ward 46
22933 W. Leland Ave.: W. Leland Avenue/ W. Wilson Avenue/N. Central Park Avenue/ N. Drake Avenue – Ward 33
22934 W. Balmoral Ave.: W. Balmoral Avenue/ W. Summerdale Avenue/ N. Clark Street/ N. Glenwood Avenue – Ward 48
22935 W. Wilson Ave.: W. Sunnyside Avenue/ N. Sacramento Avenue/ N. Richmond Street – Ward 33
22936 W. Berteau Ave.: W. Berteau Avenue/ W. Belle Plaine Avenue/ N. Harding Avenue/N. Springfield Avenue – Ward 39
22937 W. Leland Ave.: W. Leland Avenue/ W. Eastwood Avenue/ N. Clarendon Avenue – Ward 46
22938 W. Lawrence Ave.: W. Lawrence Avenue/W. Leland Avenue/ N. Albany Avenue/ N. Whipple Street – Ward 33
22939 W. Argyle St.: W. Argyle Street/W Ainslie Street/N. Shore Channel Trail/ N. Francisco Avenue – Ward 40
The Project includes reconstruction of alley sewers, subgrade and pavement utilizing recycled construction materials and methods implemented by the City of Chicago, full depth alley pavement reconstruction. In addition, the Work includes proper handling and disposal of onsite material, portland cement concrete base course, hot-mix asphalt surface course, sewer and drainage structures, sewer cleaning and televising, vortex restrictors, concrete curb and gutter, concrete sidewalks and ADA Ramps various depths, concrete driveways, concrete garage aprons, concrete alleys, pre-molded rubber Speed Bumps, permeable concrete block pavers (W. Balmoral Ave. and W. Leland Ave./ W. Eastwood Ave.), bedding & void opening aggregates for permeable concrete block pavers, geotechnical fabric, topsoil, and hydraulic seeding.
Contractor will be required to prepare a Phasing and Logistics Plan within 30 days of Notice to Proceed (“NTP”) for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work.
Contractor shall provide critical submittals, including sewer and drainage structures and pavers, as applicable, within 30 days of issuance of the NTP. On-site construction work at each alley location must be completed within 45 calendar days from commencement of work for alleys without concrete block pavers, and 60 days for alleys that include concrete block pavers.
DOCUMENT AVAILABILITY:
- Book 1 Instructions to Bidders may be found here
- Master Bid Form may be found here
- Plans and specifications, including any Addenda issued for the above-referenced project may be found here: BluEdge
- The list of Assist Agencies who will have access to complete sets of digital drawings and specifications can be found here.
PRE-BID ACTIVITIES:
On Monday, May 18, 2026, PBC will host a Non-Mandatory Virtual Pre-Bid Meeting at 11:00 a.m., and a Non-Mandatory Virtual Technical Review Meeting at 11:30 a.m. on ZOOM virtual meeting platform.
To join click on the link or call the number below:
-
- Meeting Link: CDOT CAPITAL PROGRAM – Alleys (Various Locations) – Package 7
- Meeting Phone Number: 312-626-6799
- Meeting ID: 826 9309 5133
- Meeting Passcode: None required
Subcontractors and suppliers are encouraged to attend.
Pre-Bid/Tech Review Materials:
(To be uploaded once available)
To view related video(s), please click on respective link(s) below:
(To be uploaded once available)
Addenda:
(To be uploaded once available)
BID OPENING:
Sealed bids shall be received electronically by Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org and pbc-procurement@cityofchicago.org, by 11 a.m. on Monday, June 1, 2026. A Public Bid Opening, streamed on the PBC YouTube channel, will immediately follow at 11:00 a.m.
Please refer to Book 1 Instructions to Bidders, Submission of Bids, for further instructions.
Bid Tabulation:
(To be uploaded once available)
To view related video(s), please click on respective link(s) below:
(To be uploaded once available)
QUESTIONS:
All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org no later than May 25, 2026.
Public Building Commission of Chicago
Mayor Brandon Johnson, Chairman
Ray Giderof, Executive Director
Office of Inspector General Complaint Hotline
If you see corruption, fraud, waste, or dishonest practices of any kind please report it to the City of Chicago Office of Inspector General (OIG) – PBC’s oversight body. Concerned employees, contractors, consultants, and members of the public may contact OIG via its independent hotline and website.
Telephone Reporting: (866) IG-TIPLINE (866-448-4754).
Web Reporting: http://ChicagoInspectorGeneral.org/Get-Involved