The PBC Board has approved a Partial Undertaking Request from the Board of Education for renovations at George Washington High School.
The project is anticipated to include renovations to the existing Washington High School: roof replacement and repair, façade improvements and masonry restoration as well as limited interior improvements: new paint, renovation of the gymnasium and auditorium, ADA accessibility upgrades and targeted ceiling tile replacement. Site improvements include a new ornamental fence, landscaping, and concrete repairs as needed.
George Washington High School is a public, four-year comprehensive neighborhood high school serving the communities of East Side, Hegewisch and South Deering on the far southeast side of Chicago.
Follow this project on Twitter @PBCChi #WashingtonHSReno
View the construction contract details for this project here.
Architect of Record: Wallin Gomez Architects
AOR Contract: PS3041
Construction Manager at Risk: UJAMAA Construction, Inc.
CM Contract: PS3025H
Pay Applications:
- Pay Application #1 (10/24/19)
- Pay Application #2 (12/16/19)
- Pay Application #3 (2/18/20)
- Pay Application #4 (4/1/20)
- Pay Application #5 (5/8/20)
- Pay Application #6 (7/2/20)
- Pay Application #7 (8/4/20)
- Pay Application #8 (8/12/20)
- Pay Application #9 (9/25/20)
- Pay Application #10 (11/5/20)
- Pay Application #11 (1/14/21)
- Pay Application #12 (2/18/21)
- Pay Application #13 (4/30/21)
- Pay Application #14 (6/23/21)
- Pay Application #15 (9/27/21)
- Pay Application #16 (4/18/22)
- Pay Application #17 – N/A
- Pay Application #18 (3/7/23)
- Construction Flyer (4/2019)
- Advertisement for Bids (5/3/19)
- CM Alert 01 (5/3/19)
- Advertisement for Bids (5/24/19)
- CM Alert 02 (5/24/19)
- Advertisement for Bids (6/3/19)
- CM Alert 03 (6/6/19)
- Project Notice (8/2019)