Chlorine Improvements
LEED Certified: Silver
A 37,000 sq. ft. structure designed to house new chlorine processing equipment. Site work includes roadway improvements and 40 new parking spaces.
The project includes the removal of existing chlorination equipment, the installation of new chlorination equipment, new water lines, a new electrical feeder from an existing substation, provisions for new emergency scrubbers, new hoisting equipment, new compressed air equipment, improvements to the process control system and miscellaneous work as required to provide a complete installation.
LEED Features: Light colored pavement to reduce heat island effects. The building seeks LEED basic certification.
* formerly known as the South Water Purification Plant
- Pay Application 1
- Pay Application 2
- Pay Application 3
- Pay Application 4
- Pay Application 5
- Pay Application 6 (8/28/07)
- Pay Application 7 (9/28/07)
- Pay Application 8 (10/22/07)
- Pay Application 9 (12/4/07)
- Pay Application 10 (12/21/07)
- Pay Application 11 (2/1/08)
- Pay Application 12 (3/12/08)
- Pay Application 12 (4/1/08)
- Pay Application 14 (5/2/08)
- Pay Application 15 (5/23/08)
- Pay Application 16 (7/29/08)
- Pay Application 17 (8/25/08)
- Pay Application 18 (9/3/08)
- Pay Application 19 (10/30/08)
- Pay Application 20 (12/17/08)
- Pay Application 21 (2/9/09)
- Pay Application 22 (2/9/09)
- Pay Application 23 (2/10/09)
- Pay Application 24 (3/25/09)
- Pay Application 25 (3/23/09)
- Pay Application 26 (5/15/09)
- Pay Application 27 (7/10/09)
- Pay Application 28 (7/10/09)
- Pay Application 29 (9/23/09)
- Pay Application 30 (11/2/09)
- Pay Application 31 (12/2/09)
- Pay Application 32 (12/14/09)
- Pay Application 33 (1/29/10)
- Pay Application 34 (2/3/10)
- Pay Application 35 (2/19/10)
- Pay Application 36R (7/16/10)
- Pay Application 37 (11/8/10)
- Pay Application 38 (2/18/11) Final