Richard Edwards Dual Language Fine & Performing Arts IB School Annex and Renovation

4815 South Karlov Avenue
{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

This two-part project includes the construction of a 3-story annex and renovations to the existing school building. Renovations were required in all areas affected/damaged by roof water infiltration, and damaged masonry water infiltration includes the first and second floor classrooms, gymnasium, auditorium and ancillary spaces. The required exterior repairs include a new roof system, masonry tuckpointing and lintel repairs. There will be upgrades to the mechanical, electrical and plumbing systems as it relates to the existing roof, and facade element failures.

The 50,000-square-foot annex was completed in 2016. The annex houses a lunchroom/multipurpose room, kitchen, and 24 classrooms. Three spaces in the main building were also renovated for educational use. Two modular units were demolished or removed upon completion of the annex, and a new playground was installed.

4815 South Karlov Avenue
Ward 14: Archer Heights