The PBC Board has approved a Partial Undertaking Request from the Board of Education for the Hancock Replacement School project.
Hancock College Prep’s three-story replacement school will house typical classrooms as well as additional specialty spaces. The school will have a gymnasium with stage, a dedicated black box theater, and multipurpose rooms to support CTE, STEM and STEAM programming. The campus will feature a landscaped plaza area and parking lot.
The PBC is managing the construction of this project, which is being developed by the Design-Build team of K.R.M./ALL Joint Venture.
Follow this project on Twitter @PBCChi #HancockHS
View the Design-Build contract details for this project here.
Press Release: Here
Design Architect: SMNG A, Ltd.
DA Contract: PS2048C
Design Builder: K.R.M/ALL Joint Venture
DB Contract: PS3022
Pay Applications:
- Pay Application #2 (12/16/19)
- Pay Application #3 (1/23/20)
- Pay Application #4 (2/18/20)
- Pay Application #5 (3/3/20)
- Pay Application #6 (4/14/20)
- Pay Application #7 (5/8/20)
- Pay Application #8 (6/10/20)
- Pay Application #9 (7/8/20)
- Pay Application #10 (8/5/20)
- Pay Application #11 (8/28/20)
- Pay Application #12 (9/23/20)
- Pay Application #13 (11/25/20)
- Pay Application #14 (12/16/20)
- Pay Application #15 (1/13/21)
- Pay Application #16 (2/10/21)
- Pay Application #17 (2/25/21)
- Pay Application #18 (4/16/21)
- Pay Application #19 (4/30/21)
- Pay Application #20 (6/17/21)
- Pay Application #21 (7/9/21)
- Pay Application #22 (8/5/21)
- Pay Application #23 (9/20/21)
- Pay Application #24 (10/20/21)
- Pay Application #25 (11/10/21)
- Pay Application #26 (12/2/21)
- Pay Application #27 (12/15/21)
- Pay Application #28 (1/10/22)
- Pay Application #29 (2/18/22)
- Pay Application #30 (4/8 & 4/28/22)
- Pay Application #31 (6/17/22)
- Pay Application #32 (8/29/22)
- Pay Application #33 (12/7/22)
- Pay Application #34 (3/1/23)
- Pay Application #35 (4/12/23)
- Pay Application #36 (6/10/24)
- Pay Application #37 (8/27/24)