The addition is planned as a one-story Annex with a two-story link to the existing school and includes site development work and renovations of the existing 1971 school building. The program scope for the Annex will include a Science and Pre-Engineering Lab, elementary gymnasium with gym office and storage, unisex toilet, building services, and 2-stop elevator for access between the Annex and existing 1971 school building. Site development scope for the Annex will include a playground, artificial turf field and landscaping.
The new Annex and site will be designed and constructed to achieve a minimum LEED for Schools 2009 Certification as defined by the USGBC.
Social Media
10845 South Union Avenue
Ward 21: Roseland
CONTRACT INFORMATION
Architect of Record:
FGM Architects /JilTech
Contract:
General Contractors:
Powers and Sons Construction Company, Inc.
Contract:
General Contractors:
Old Veteran Construction, Inc.
Contract:
PROJECT DOCUMENTS