The project consists of a CDOT Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the two (2) locations. Work includes but isn’t limited to excavation, hot-mix asphalt, sewer main, drainage structures, roadway lighting, pavement marking, landscaping and concrete: curb, gutter, sidewalks, driveways and alleys.
Prospective but not limited to the following trades performing work on these projects are laborers, electrician, plumbers, truck drivers, operating engineers and traffic safety just to name a few.