PS2032

Fire Station E16 - Review the construction documents, system design, engineering and installation of the HVAC System including geothermal equipment, which includes circulation pumps, make-up air units and related controls ACE will also evaluate the performance and control of exhaust fans located in the mechanical room.

Other Documents:
Board Approval Date:
08/14/2014