![featured image William P. Gray Elementary School](https://pbcchicago.com/wp-content/uploads/2015/06/gray-school-front.jpg)
Air Conditioning installed in summer 2015 as part of the CPS Air Conditioning Program.
This school was part of Region A. See more Region A projects here.
3730 North Laramie Avenue
Ward 30: Portage Park
PROJECT DOCUMENTS
Air Conditioning installed in summer 2015 as part of the CPS Air Conditioning Program.
This school was part of Region A. See more Region A projects here.